This spring was incredibly wet [lots of rain for weeks] which delayed things even more. I stopped by in June and there was still about 12" of snow at the gate. and all the rain made it very muddy and not great conditions for heavy equipment. Finally we have had a dry spell and I was able to get the house movers back this Saturday to retreive their large beams. They scarred a couple of trees getting them out, but with so many there to work around I'm just pleased they didn't have to cut any down to get them out of the way.
Now, if we can get the framing done, plumbing and electrical hooked back up and a fireplace installed we'll at least be able to keep the place heated and work on it through the fall as it starts to get cold.